 |  |  |  |
Step 1. Unpack your marquee and familarise yourself with the load and carry handles. | Step 2. Lie it down using load handles to ensure you can access the pockets. | Step 3. Unzip the bottom zip and fold back the steel plated base with wheels | Step 4. Stand the unit up and remove the pegs & ropes from the peg pocket as required. |
 |  |  |  |
Step 5. Unpack the Roof from the roof pocket and unfold - ready to fit. | Step 6. Now remove the transit bag and place aside out of the way. | Step 7. Move the frame to the CENTRE of where the marquee will be used and pull legs up and out diagonally. | Step 8. Ensure that the frame extends to approx. half extended size at this stage. |
 |  |  |  |
Step 8. Now fit the roof, and secure the the corners via the velcro corner fasteners on the legs | Step 9. Ensure the roof is sitting properly on the frame before extending further. | Step 10. Now extend the frame further and latch the top pull fasteners on each corner.Marquee roof is now taut and frame is extended. | Step 11. Now extend the legs via the leg fastening rings, one position at a time - doing a side at a time. |
 |  |  |  |
Step 12. Adjust the legs to obtain the desired height of marquee ceiling. Now the base marquee is erected. | Step 13. If you have purchased walls, you now begin by fitting the rear wall first. | Step 14.The rear wall secures to the velcro on the roof valance and velcro tabs on the legs both sides. | Step 15.. Remember to zip the walls together at the leg poles using the marine grade quality zips. |
 |  |  |  |
Step 16. Finish the first side wall and secure to the frame. | Step 17. Now fit the next side wall and secure to the frame. | Step 18. To complete the wall fitting, you fit the front wall with doorway to fully enclose your marquee | Step 19a. Now you must secure the marquee. On soft ground, use the pegs supplied and hammer thru the frame feet into the soil.Then use the guy ropes accordingly. |
 |  |  |  |
Step 19b. On hard surfaces, use the accesory units such as the 15kg Steel Weight item to secure the frame feet. | Step 19c. A popular choice on hard surfaces is the sand filled Weight bag, thal also applies 15kg of downforce. | Step 20. Now to finalise setup, you can adjust the windows as you require for ventilation. | Step 21. If you have multiple marquee's together, you now install the leg clamps and gutters to secure the structures together. |
 |  |  |  |
| | | | |
| | | | |